Case Studies

We are bonded for sewage works. These examples show a 3.8m deep saddle connection onto an adopted 375 diameter Thames Water sewer and a 80m diveriosn of a live sewer on an adopted Anglian Water main.

This entire timber barn was dismantled and salvaged along with the masonry and slate to provide material for a reclamation company whilst reducing the amount of waste generated during the development.

Designed earthwork support used in conjunction with a deep strip foundation whilst working in close proximity to an adopted sewer with a prohibition on piled or driven foundation techniques.